|
||||||||||||||||||||
Note:
The ALJP Administrator and the committee will make a determination on the
product lines to be bid within the ALJP2012a ITB to be released in the Spring
2012. Those Product Lines may or may not include new ALJP Product lines that the
School System Level Technology Coordinators have requested or Current contracts
that are near expiration. If an interested bidder does not see a product
line they are interested in providing through the ALJP program in any posted ITB
then the interested bidder should be aware that the ALJP Administrator does not
take requests from vendors to have a new product line added to future or
established/posted ITBs. The requests as previously stated are to be
entered by the School System Level Technology Coordinator/Director. These
system level contacts have an established procedure to make the request(s).
Should they have any questions then they (the System Level Technology
Coordinator/Director) should contact the ALJP Administrator for assistance. Upon
the next ITB development (ALJP2012a tentatively), the ALJP Administrator
and the ALJP Committee will make a determination of interests and include those
product lines in that upcoming ITB. Interested vendors should not inundate
the ALJP Administrator with these type requests by email or phone. Please
follow procedure in submitting question for the ALJP2012e ITB. Read the entire
document prior to submitting questions.